Workflows

Pick a task. Each guide shows the steps, the picture, the common mistakes and a short quiz.

Reservoir engineering

From raw well logs to net pay

Turn a set of log curves into zones, porosity, water saturation and a net pay number you can defend.

Field
Reservoir engineering
Level
Beginner
Time
15 min

You finish withA zone-by-zone table of net thickness, average porosity and average water saturation, with the cutoffs you used.

Reading a pressure build-up test

Go from raw gauge data to permeability, skin and boundaries by reading the derivative plot step by step.

Field
Reservoir engineering
Level
Intermediate
Time
20 min

You finish withReservoir pressure, permeability-thickness, skin, and any boundaries seen, with the model match shown on the log-log plot.

Production engineering

Drawing a well schematic others can trust

Collect the right documents, build casing and completion tables, and produce a schematic that matches what is really in the hole.

Field
Production engineering
Level
Beginner
Time
12 min

You finish withA schematic plus an equipment table, each item with its depth, size, source document and date.

Coming next

Tell us which one you need first. The most requested guide gets written first.